Sure are kev thanks,

.
Here steptoe job today, strip job on kitchen units,
Kit out 1 of his rent houses, selling it after, 8 hours action. marble tops, 2m etc, 4 of, glued to the hilt.
Back units made on site by ob1 joiner, not a shop jobs,
So how long working out which screw etc,
Quote late in the day, should have looked at it b4 buying etc, then not bothered.
Was great fun.
Will be a right pig on rebuild. I on hols when its being fitted lol. Al,